Construction materials for a hydroelectric dam were delivered to Kasai Central, per ACP.cd.
DR Congo faces growing fears of a cholera resurgence, according to All Africa.
A Chinese mining firm is being demanded USD 6 million in compensation over a toxic wastewater spill in Lubumbashi, TrendsAfrica reports.
E14 places every story on a stack of fifteen floors, from the fields under everything to the planet acting as one. This one sits on E11, organizations; the pressure it names: mining concerns. Its words also reach E7 ecosystems, E10 institutions and E3 chemistry.
Here it is a dynamic between organizations, ecosystems and institutions: construction materials, hydroelectric dam, Chinese mining firm and Lubumbashi (E11 organizations), with cholera resurgence and growing fears (E7 ecosystems), and USD 6 million (E10 institutions).
The floor of companies and infrastructure. In this briefing: construction materials, hydroelectric dam, Chinese mining firm, Lubumbashi.
The floor of weather and living systems. In this briefing: cholera resurgence, growing fears.
The floor of money and rules. In this briefing: USD 6 million.
The floor of chemistry: what is in the air and ground. In this briefing: toxic wastewater spill.