UEL University in Londrina has deployed two large-format construction 3D printers from Be More 3D, per 3druck.com.
The initiative marks a significant step toward integrating advanced manufacturing technologies into construction practices in the region.
E14 places every story on a stack of fifteen floors, from the fields under everything to the planet acting as one. This one sits on E11, organizations; the pressure it names: 3D printing construction. Its words also reach E8 minds and E7 ecosystems.
Here it is a dynamic between organizations, minds and ecosystems: construction 3D printers and Be More 3D (E11 organizations), with advanced manufacturing technologies (E8 minds), and construction practices (E7 ecosystems).
The floor of companies and infrastructure. In this briefing: construction 3D printers, Be More 3D.
The floor of minds and discovery. In this briefing: advanced manufacturing technologies.
The floor of weather and living systems. In this briefing: construction practices.