# Shore Power Installation

- Place: Rijeka, Croatia (45.33, 14.45)
- Published: 2026-11-20T01:02:38.795Z · expires 2026-11-27T01:02:38.795Z
- Floors (The Arena): E11 Organizations, E3 Chemistry, E10 Institutions, E13 Civilizations
- Page: https://emergencemachine.com/brief/g77
- AI-written summary of the sources below; check them.

Rijeka will install shore power at both container terminals, per shipandbunker.com.

The move aims to reduce emissions from ships while docked, improving local air quality.

Croatia's maritime infrastructure modernization aligns with EU environmental goals.

## Sources

- [Rijeka to Install Shore Power at Both Container Terminals](https://shipandbunker.com/news/emea/845218-rijeka-to-install-shore-power-at-both-container-terminals) · shipandbunker.com · 2026-11-19

## Open data shown on the globe

- Smog in the air · Open-Meteo · CAMS (Copernicus Atmosphere Monitoring Service): PM2.5 over Rijeka: 8.6 µg/m³ · 0.6× WHO's daily guideline; NO₂ 9.0 µg/m³ · US AQI 49 · highest nearby 32.5 µg/m³; model of the air right now · check: https://www.windy.com/-PM2-5-pm2p5?cams,pm2p5,45.33,14.45,7
