Rijeka will become the first northern Adriatic port with shore power for container ships, croatiaweek.com reports.
The new infrastructure will allow ships to connect to the electrical grid while docked, reducing emissions and noise pollution.
The project is set to be completed at both container terminals, according to shipandbunker.com.
E14 places every story on a stack of fifteen floors, from the fields under everything to the planet acting as one. This one sits on E11, organizations; the pressure it names: shore power project. Its words also reach E10 institutions and E3 chemistry.
Here it is a dynamic between organizations, institutions and chemistry: northern Adriatic port, container ships and container terminals (E11 organizations), with shore power and electrical grid (E10 institutions), and emissions and noise pollution (E3 chemistry).
The floor of companies and infrastructure. In this briefing: northern Adriatic port, container ships, container terminals.
The floor of money and rules. In this briefing: shore power, electrical grid.
The floor of chemistry: what is in the air and ground. In this briefing: emissions, noise pollution.