The Erdenet Mining Corporation sold copper concentrate on the Mongolian stock exchange, per montsame.mn.
In Selenge province, the Sukhbaatar Thermal Power Plant's first turbine-generator is operating at 36.4 MW, reports montsame.mn.
Mongolia and South Korea signed an intergovernmental consular agreement, noted by montsame.mn.
E14 places every story on a stack of fifteen floors, from the fields under everything to the planet acting as one. This one sits on E11, organizations; the pressure it names: mining sale power plant. Its words also reach E10 institutions and E12 states.
Here it is a dynamic between organizations, institutions and states: Erdenet Mining Corporation and Sukhbaatar Thermal Power Plant (E11 organizations), with copper concentrate, 36.4 MW and intergovernmental consular agreement (E10 institutions), and Mongolia and South Korea (E12 states).
The floor of companies and infrastructure. In this briefing: Erdenet Mining Corporation, Sukhbaatar Thermal Power Plant.
The floor of money and rules. In this briefing: copper concentrate, 36.4 MW, intergovernmental consular agreement.
The floor of states and force. In this briefing: Mongolia and South Korea.